News for Atascadero, CA|Monday, April 21, 2025
You are here: Home » Region » Unit 2 at Diablo Canyon operating at full power
  • Follow Us!

Unit 2 at Diablo Canyon operating at full power 

Diablo Canyon

Pacific Gas and Electric Company’s (PG&E) Diablo Canyon Power Plant Unit 2 has been returned to service and is now operating at 100 percent power.

Unit 2 had been shut down since December 1, when a grid monitoring protective feature detected a lower than normal current on the transmission lines. Upon sensing the operation of the grid protective feature last Saturday, Unit 2 performed as designed and automatically went off line to protect equipment.

Unit 1 is currently operating at 55-percent power due to maintenance activities.

About the author: News Staff

News staff of the A-Town Daily News wrote and edited this article from local contributors and press releases.

A-Town Daily News on Google
A-Town Daily News | 7343 El Camino Real #235 | Atascadero, CA 93422 | (805) 226-5720